Case Study

R W Simon have recently completed the supply and installation of nearly 200 sq metres of our 150mm elliptical blade profiles.

The 206 blades have integrated into the steel structure to ensure the computer and teaching centres are shaded to reduce the heating load on the south and west elevations.

The college is a steel frame structure with cedar cladding and includes aluminium curtain walling as well as Photovoltaic panels and rainwater harvesting systems.

Constructed by Markey Builders the 1540 Sqm facility designed by CAD Associates was opened in September in time for new academic year.

Location

Hartpury House, Hartpury, Gloucester, GL19 3BE button to google maps